Biomass / Woodstove
800-218-4947
Email us
*** Asterics indicates non-stock items. Call for lead times. Click for details
Peak Roof Flashing* This component is required for chimney installations passing through the roof peak. For HT applications, 4 radiation shields (supplied) must be installed on the roof joists. It is available in two models: " Peak roof: 1/12 to 7/12 FPR " Peak roof: 8/12 to 12/12 FPBR * All flashings are vented.
This component is required for chimney installations passing through the roof peak. For HT applications, 4 radiation shields (supplied) must be installed on the roof joists. It is available in two models:
" Peak roof: 1/12 to 7/12 FPR
" Peak roof: 8/12 to 12/12 FPBR
* All flashings are vented.